top of page

UPDATED DESIGN

This is the iterated design after removing excess material

piston_new.png

aPRIORI COST ANALYSIS

piston_head.PNG
connectin_rod_lower.PNG
apriori_new_assembly.PNG

Cost Analysis of Iterated Design

COST ANALYSIS SUMMARY

From comparing the two models it can be seen that the iterated model cost $8.90 in its fully burdened cost whereas the original part cost $9.59 as part of its fully burdened cost. There can therefore be seen a 7% decrease in the cost. However one noteworthy omition from this cost analysis are the fasteners. However since the same fasteners are used in both iterations, their impact on the cost analysis can be ignored. 

bottom of page